Jacksonville ISD

BOND 2017 Updates » Big changes as the demo begins

Big changes as the demo begins

The demo of the inside of the Tomato Bowl includes removing the back wall to allow space for the visitors seating, restrooms, locker room, and concession.  The rocks have been saved and will be re-used inside of the stadium to surround the field with a low wall.  The home side concrete stands are being removed and will be rebuilt with ADA accessible steps and seating.  The concession stands in the entry are being completely renovated, and the restrooms are being rebuilt.  The roof on the building is being removed and new roofing replaced.  The outside of the main building will look exactly the same, with updated windows, paint and hidden wiring.